Sub Unit PM-005-194133
u-9-005

General Information
Primary Species
Links
General Wildlife Measures
No new roads or linear corridors.
No removal of forest cover
To protect and conserve the habitat of northern caribou.
Prevent new linear corridors or new access.
New development to use existing disturbance
Limit impacts to forest cover.
Minimize disturbance in late winter period. Critical activity to be completed Nov01-Feb15
Minimize habitat loss, alteration and degradation, prevent fragmentation and linear disturbances.
Maintain and protect key arboreal & terrestrial lichen.
Minimize line-of-sight and provide visual screening along new disturbances.
Reduce sensory disturbances and displacement of caribou
Avoid:
Peatland complexes
Fens and black spruce bogs
Complex water bodies
Mature black spruce stands (lichen)
Lichen bearing stands
Mature pine leading stands
Planning Measures:
Construct any new access to the lowest standard possible (whilst meeting safety considerations).
Minimize impacts to lichen and caribou habitat:
avoid mature black spruce and pine on sunny aspects
Maintain high quality caribou habitat and forage
Operational Measures:
Minimize impacts to lichen and caribou habitat:
use snow cover and frozen ground to improve lichen survival and regeneration
retain mature/old trees for dispersal of lichen
avoid impacts to surficial hydrology, flow patterns and natural drainage
retain mature and old seral stage forest
Minimize predator mobility and attractants
limit snow ploughing
provide visual screening along roads
Minimize line of sight along roads and linear features
Avoid seeding grass and legume based mixes.
Minimize growth of early seral forage/browse in clearings
Promote regeneration of natural pre-development ecosystem.